Return to Today's Publications

 

Newsletter:
Date Range (YYYY-MM-DD) -
Company, Industry or Technology:
  Search Tips


Vestas Touts 113 MW of European Wind Turbine Orders (Int'l)
Vestas
Date: 2018-10-03
Danish wind turbine giant Vestas Wind Systems A/S reports it has secured contracts to supply 113 MW of wind turbines for projects in Germany, Finland and Sweden.Vestas will supply two units of its V150-4.2 MW turbines to NOTUS energy Plan GmbH & Co KG for installation at the Lubbenow II and Lubbenow III wind parks in Germany in #q, 2019. The contract includes a 20-year Active Output Management 4000 (AOM 4000) service agreement and a VestasOnline Business SCADA monitoring system. Vestas has also secured a 59-MW, 14-unit contract in Finland from Germany-based Wpd AG and 42 MW total capacity turbine order from Swedish wind developer OX2. (Source: Vestas, Renewables, 1 Oct., 2018) Contact: Vestas, +45 9730 0000, www.vestas.com

More Low-Carbon Energy News Vestas,  Wind,  Wind Turbine,  


EDP Renewables Opens Romanian Wind Energy Storage Facility (Int'l)
EDP Renewables
Date: 2018-10-03
Madrid-headquartered renewables specialist EDP Renewables (EDPR) is reporting the opening of a pioneering battery-based wind energy storage facility at the 2012 vintage, 26-MW Cobadin Wind Farm in Romania. The facility is the first energy storage undertaking in Romania, according to the company's website.

EDP Renewables, the world's fourth-largest wind energy producer, is presently active in Belgium, Brazil, Canada, France, Greece, Italy, Mexico, Poland, Portugal, Romania, Spain, the UK, and the US. In 2017, the company generated 27.6 TWh through facilities with a combined installed capacity of 11 GW in 11 countries. (Source: EDP Renewables, Balkan Green Energy News, 1 Oct., 2018) Contact: EDP Renewables, www.edpr.com/en

More Low-Carbon Energy News EDP Renewables,  Wind,  Energy Storage,  


Ill. Panther Creek Wind Farm Anticipate Groundbreaking (Ind. Report)
Illinois Winds LLC
Date: 2018-10-03
Shanbbona, Illinois-based FPL Energy Illinois Winds LLC reports it plans to soon break ground on the 25-turbine, $50 million Panther Creek Wind Farm just west of the city of Pittsfield. Whem fully operational in 2020, the farm will generate sufficient electric power for 18,000 area homes. The company is negotiating with Springfield-based Prairie Power on an interconnection agreement

Illinois presently has 2,632 operational wind turbines at 49 wind farms, which provided 6.2 pct of all in-state electricity production. Illinois' Renewable Portfolio Standard requires that utilities and retail electric suppliers generate 25 pct of their electricity sales from renewable energy sources like wind, solar and biomass energy by 2025. (Source: Illinois Winds, Journal Courier, Oct., 2018) Contact: Illinois Winds, Bill Damon, VP, 815-824-2182

More Low-Carbon Energy News Illinois Winds ,  Wind ,  


National Grid R.I. RfP Seeks 400-MW Renewables (Ind. Report)
National Grid
Date: 2018-10-01
Rhode Island's largest electric distribution company, National Grid, reports it has issued an RfP seeking proposals to contract up to 400 MW of renewable power and renewable energy certificates (RECs).

According to a notice last week by law firm Pierce Atwood, the Request for Proposals (RfP) is for renewable energy facilities with capacities of between 20 MW and 200 MW. The contracted period will be 10-15 years.

The competitive round is limited to "newly developed renewable energy resources" such as solar, wind, small hydro, eligible biomass, fuel cells, and waste-to-energy projects.

Each eligible candidate has to take part with at least one bid of 20 MW-200 MW and may also submit one or several alternative offers with capacities of between 200 MW and 400 MW. While projects do not have to be located within the state, they must "provide substantial direct economic benefits to Rhode Island, such as job creation or property tax revenues.

National Grid expects to conditionally select bidders for negotiation on May 2, 2019 and submit contracts to the state PUC by August 30, 2019. (Source: National Grid, Renewables, 27 Sept., 2018) Contact: National Grid, www.nationalgridus.com/RI-Business

More Low-Carbon Energy News Solar,  National Grid,  


IEA Predicts 200 GW of European Offshore Wind by 2040 (Int'l)
International Energy Agency
Date: 2018-10-01
Speaking at the Global Wind Summit on Tuesday, International Energy Agency (IEA) Exec. Dir. Fatih Birol predicted that wind energy would play "a critical role" in the world's energy mix over the coming decades. In Europe, offshore wind presently accounts for almost 5 pct of electricity generation and could generate as much as 1,100 TWh by 2040, Birol predicted.

According to Birol's prediction, not only will wind account for over 30 pct of Europe's electricity generation -- more than any other energy source -- Europe's offshore wind capacity is on track to reach nearly 200 GW by 2040, and could in fact go much higher.

The global offshore wind energy industry currently boasts approximately 20 GW worth of capacity installed primarily in European waters -- while the onshore wind industry boasts over 500 GW. (Source: IEA, Various Media, CleanTechnica, 27 Sept., 2018) Contact: IEA, Fatih Birol, Director, www.iea.org

More Low-Carbon Energy News International Energy Agency,  Wind,  Offshore Wind,  Fatih Birol ,  


Tidal Turbine Specialist Generates Private Investment (Int'l)
Scotrenewables
Date: 2018-09-28
Orkney Islands-based floating tidal turbine developer Scotrenewables Tidal Power Ltd reports it has secured a multi-million pound investment from the McGrath family and Matthias Haag -- the former CEO of the company behind the 600-MW Gemini offshore wind park. Scotrenewables also received support from the Scottish government's Energy Investment Fund.

Scotrenewables is preparing for a 2019 construct and installation of its SR2-2000 tidal power turbine. (Source: Scotrenewables Tidal Power Ltd., Renewables, 26 Sept., 2018) Contact: Scotrenewables Tidal Power Ltd., office@scotrenewables.com Telephone: 01856 851641 www.scotrenewables.com

More Low-Carbon Energy News Tidal Energy,  


Eolus Vind Secures $119Mn Credit Agreement (Int'l. Report)
Eolus Vind
Date: 2018-09-28
Renewables Now is reporting Hasselholm, Sweden-headquartered wind projects developer Eolus Vind AB has secured a 4-year, €101 million ($119 million) credit agreement with Swedbank. The funds will be used for expansion and to support new and ongoing projects and liquidity for daily operations.

According to the company, it has installed over 540 units of the roughly 3,400 wind turbines currently operating in Sweden, and operates over 400 MW on behalf of customers. (Source: Eolus Vind Contact: Eolus Vind AB, Per Witalisson, CEO, +46 10 199 88 02, www.eolusvind.com

More Low-Carbon Energy News Eolus Vind,  Wind,  


Ontario Premier Ford Criticized for Scrapping of Cap-and-Trade (Opinions, Editorials & Asides)
Ontario
Date: 2018-09-28
At Queens Park, the Province of Ontario's environmental watchdog Dianne Saxe is criticizing the freshman conservative government of Premier Doug Ford for dismantling the province's cap-and-trade system without putting in an effective climate change program to replace it. Conservative Premier Doug Ford made cancelling cap-and-trade a key aspect of his campaign.

According to the environmental commissioner, the government's decision could reverse the province's decade of progress in cutting greenhouse gas emissions. (Source: Windsor Star, The Canadian Press, 25 Sept., 2018) Contact: Ontario Environmental Commissioner Dianne Saxe, (416) 325-3377, commissioner@eco.on.ca, https://eco.on.ca

More Low-Carbon Energy News Ontario,  Cap-and-Trade,  Carbon Market,  Doug Ford,  


MHI Vestas Launches 10MW Wind Turbine (New Prod & Tech)
MHI Vestas
Date: 2018-09-28
Offshore wind turbine giant MHI Vestas reports it has launched the first commercially-available 10 MW offshore wind turbine. The V164-10.0 MW turbine features a rotor diameter of 164 meters and turbine blades 80 meters in length with a swept area larger than the London Eye, and the height from base to tip of approximately 187 meters. (Source: MHI Vestas, Sept., 2018) Contact: MHI Vestas, MHI Vestas CEO, Philippe Kavafyan, www.mhivestasoffshore.com

More Low-Carbon Energy News MHI Vestas,  Vestas,  Wind,  Wind Turbine,  


Ratch Raises Final Mount Emerald Wind Farm Turbine (Int'l Report)
Ratch Australian Corporation
Date: 2018-09-26
In the Land Down Under, Sydney, Australia-based Ratch Australian Corporation reports it has raised the last of 53 turbines at its $360 million, 180-MW Mount Emerald Wind Farm. The facility generated its first energy in August.

According to Ratch's EGM business development Anthony Yeates, "We are now producing at 60MW or about 33 pct of full capacity. Vestas has conducted a series of grid performance tests and the results are now being analysed by the Australian Energy Market Operator. We hope to be able to step up to 130MW or about 70 pct of capacity in early October."

When fully operational, Mount Emerald will be the largest wind farm in Queensland and will generate sufficient power for approximately 75,000 North Queensland homes. (Source: Ratch Australian Corporation, Ecogeneration, Sept 24, 2018) Contact: Ratch Australian Corporation, Anthony Yeates, Exec. GM, +02 8913 9400, www.ratchaustralia.com

More Low-Carbon Energy News Wind,  Australia Wind,  ,  


ONYX InSight Calls for Wind Turbine Data Access (Ind. Report)
ONYX InSight
Date: 2018-09-26
According to UK-headquartered ONYX InSight -- a predictive analytics partner for asset owners and operators -- restrictions on access to operational turbine performance data are limiting the wind industry's ability to reduce its O&M costs. ONYX InSight also notes that restrictions on wind-turbine data may be unlawful under EU competition law and impede the growth of the wind industry.

O&M-related expenditure constitutes 58 pct of all operational expenditure costs, much of which is due to reactive, unplanned maintenance. While the industry is increasingly turning to predictive maintenance programs and condition monitoring systems (CMS) that allow for proactive, cost-efficient interventions, these approaches rely on a continuous stream of high-quality, readable data to operate effectively and contribute to lowering the overall levelized cost of energy (LCoE).

However, at present asset owners and operators face significant challenges in accessing this data, as there is no clear approach to data access across equipment suppliers. Only a minority of OEMs allow significant and open access to data. In the main, OEMs manage access for users, providing a highly-processed subset of this data, or allowing no free access at all.

The high-quality performance data for optimized O&M which owners need does not include turbine specifications, load calculations or other potentially sensitive design IP, so there should be no excuse for restrictions on data access. But, of the top eleven CMS hardware providers -- who between them account for over 80 pct of the market -- only one gives full access to CMS data, and seven do not permit any access to data whatsoever, according to ONYX InSight. (Source: Windpower Engineering & Dev., ONYX InSight, Sept., 2018) Contact: ONYX InSight, Bruce Hall, CEO, +44 (0)115 951 8800, (303) 351- 5418 – US Office, info@onyxinsight.com, www.onyxinsight.com

More Low-Carbon Energy News ONYX InSight,  Wind,  


UK Labour Commits to Net-Zero GHG Emissions by 2050 (Int'l Report)
Climate Change UK
Date: 2018-09-26
In the UK, the Labour Party under the leadership of MP Jeremy Corbyn has committed to a target of net-zero greenhouse gas emissions by the middle of this century. Labour has also committed to generate 60 pct of the country's energy from renewable and low carbon sources by 2030. Other Labour recommendations include:
  • Making every house in the UK energy efficient to reduce heat demand from buildings by almost 25 pct;
  • Providing 85 pct of electricity demand from renewable and low carbon sources;
  • Providing 44 pct of heating demand from renewable sources;
  • A seven-fold increase in offshore wind and a doubling in onshore wind; and
  • Almost tripling solar power.

    Taken together, these measures are expected to provide enough wind and solar power to power 19.5 million homes.

    According to the Labour shadow business secretary Rebecca Long Bailey, man-made climate change represents an "existential threat" and the the UK must do better than the present Conservative government's target of cutting emissions by 80 pct by 2050. (Source: UK Labour Party, Press Association, Westmoreland Gazette, 24 Sep, 2018) Contact: UK Labour Party, https://labour.org.uk

    More Low-Carbon Energy News GHGs,  Greenhouse Gas Emissions,  Climate Change,  


  • Iberdrola Aims to Up U.S. Renewables Capacity 50 pct (Int'l)
    Iberdrola
    Date: 2018-09-26
    According to a Reuters report, Spanish wind power juggernaut Iberdrola SA plans to expand its renewable energy capacity in the U.S. by about 50 pct over four years as part of its global plan to cut carbon emissions. To that end, the company expects to invest about $15 billion in the U.S. on its transmission and distribution system and increase its renewable generation to around 10,000 MW by the end of 2022.

    Through its majority-owned Avangrid Inc subsidiary, Iberdrola has over 6,500 MW of renewables in the US. (Source: Iberdrola, Reuters, 24 Sept., 2018)Contact: Iberdrola Renewables,http://iberdrolarenewables.com

    More Low-Carbon Energy News Iberdrola,  Wind,  Offshore Wind,  


    Aggreko Launches Wind Energy Services Offering (Ind. Report)
    Aggreko,Younicos
    Date: 2018-09-26
    Clasgow, Scotland-based Aggreko, a provider of modular, mobile power and heating and cooling, reports it has combined its mobile, modular power solutions into a one-stop option that includes energy storage for the wind industry. Wind farm developers and operators can choose from a complete suite of Aggreko temporary power solutions, including energy storage systems from its microgrid and battery energy storage division, Younicos.

    Aggreko helped commission the first offshore wind farm in the United States in 2016. Younicos holds the record for integrating the largest battery resource with a wind farm (Notrees in Texas), and has incorporated energy storage into high wind penetration grids from Alaska to Northern Europe. Aggreko provides temporary power, load banks and other necessary equipment to wind farms for commissioning, and now includes plug-and-play containerized batteries with intelligent Younicos Y.Q software. (Source: Rental Equipment Register, Aggreko, 24 Sept., 2018) Contact: Aggreko, www.plc.aggreko.com; Younicos, www.younicos.com

    More Low-Carbon Energy News Wind,  Energy Storage,  Younicos,  


    Cleveland Climate Plan Sheds Fossil Fuel Past (Ind. Report)
    Climate Change
    Date: 2018-09-24
    Once the sixth largest city in America, Cleveland -- "the Best Location in the Nation" -- reports it plans to join more than 80 U.S. cities in the Sierra Club's Ready for 100 Campaign and shift to 100 pct renewable energy sources for electricity and reduce greenhouses gases to 80 pct below the 2010 level by 2050.

    Cleveland's climate action plan calls for cutting emissions through improved energy efficiency and building design; developing more renewable energy within the city and region, including offshore wind power in Lake Erie; and increased public transportation electric vehicles and EV charging stations. to reduce fossil fuel use. Cleveland, which released its first climate plan in 2013, cut its emissions by only 2 pct from 2010 levels by 2016. Cleveland now joins a list of 82 U.S. cities that have made pledges to source 100 pct renewable energy, according to the Sierra Club's Ready for 100 campaign.

    Download the Cleveland Climate Action Plan, 2018 HERE. (Source: City of Cleveland, Inside Climate News, Others, 22 Sept., 2018) Contact: City of Cleveland, Environment, www.city.cleveland.oh.us/CityofCleveland/Home/Community/Environment/DivisionofEnvironmentalHealth; Sierra Club Ready for 100 Campaign, www.sierraclub.org/ready-for-100

    More Low-Carbon Energy News Renewable Energy,  Carbon Emissions,  


    Arise Offloading 45-MW Swedish Wind Farm Project (Int'l, M&A)
    Arise AB
    Date: 2018-09-24
    Swedish wind farm developer Arise AB reports it will sell its 45-MW Brocklingeberget wind project to a fund managed by Swiss-based asset manager Re:cap global investors AG.

    The project, which will incorporate 11 Siemens DD 142, 4.1 MW turbines, is slated to break ground immediately for commissioning late in 2019. Arise will manage the construction and operation of the wind farm. (Source: Arise AB, Renewables, Others, 23 Sept., 2018) Contact: Arise AB, +35 20 20 90, www.arise.se; Re:cap global investorsAG, +41 41 725 0470, www.re-cap.ch/en

    More Low-Carbon Energy News Arise AB,  Wind,  


    Con Edison Snares 943 MW Sempra Solar Asset (Ind. Report, M&A)
    ConEdison, Sempra
    Date: 2018-09-24
    Con Edison is reporting it will close on the planned $1.54 billion purchase of 943 MW of operational solar plants and a 38 MW wind farm from Sempra before the year end -- subject to US DOE and FERC regulatory approvals. The transaction will make Con Edison the 2nd-largest owner of operational solar assets in the US.

    ConEdison plans to fund the acquisition via borrowing $825 million in long-term, non-recourse debt and issuing $715 million in equity, and will assume $576 million in debt tied to these projects. (Source: ConEdison, PV Mag., Other, 21 Sept., 2018) Contact: ConEdison, Jorge J. Lopez, Pres., CEO, (914) 286-7094, www.conedsolutions.com; Sempra Energy, Inv. Relations, (619) 696-2901, www.sempra.com

    More Low-Carbon Energy News ConEdison,  Sempra,  Solar,  


    Greencoat Acquires 9.2MW Knocknalour Wind Farm (Int'l, M&A)
    Greencoat Renewables
    Date: 2018-09-24
    Dublin-listed renewables Greencoat Renewables is reporting the acquisition of the 9.2MW Knocknalour Wind Farm in Co Wexford for €10.9 million. The Knocknalour facility, which incorporates 4 Enercon E70 turbines, was commissioned in September 2013, and has revenues contracted under the renewable energy feed-in tariff scheme.

    Ireland's first stock market-listed renewables firm is backed by AIB and the State's Ireland Strategic Investment Fund (ISIF). (Source: Greencoat Renewables, Irish Independent, 22 Sept., 2018) Contact: Contact: Greencoat Renewables, Paul O'Donnell, Partner, +353 (1) 70 26737 - Dblin, +44 20 7832 9400 - London, www.greencoat-capital.com

    More Low-Carbon Energy News Greencoat Renewables ,  Wind,  


    AEP Ohio Announces Commitment to Renewable Energy
    AEP Ohio
    Date: 2018-09-23
    AEP Ohio has announced a commitment to eventually double wind and solar generation in Ohio. Supporters say the plan sends a signal around the country to clean energy companies. AEP Ohio’s proposal is the next step in their plan to move away from coal power. Neil Waggoner is with the Sierra Club, which agreed to support the plan in 2015. Waggoner says AEP’s project and the state’s renewable energy standards are a signal to solar and wind developers. “If we just get out of our own way we’re gonna see more commitments like what AEP is trying to do and we’re gonna see Ohio clean energy just really take off," Waggoner said. Ohio lawmakers have tried repealing the standards mandating wind and solar power. A bill to change those standards could come up again after the November election. (Source: AEP, WKSU, 22 Sept., 2018)

    More Low-Carbon Energy News AEP Ohio news,  Renewable Energy news,  


    Orsted Offloads Half of UK Hornsea 1 Offshore Wind Farm (M&A)
    Orsted,Global Infrastructure Partners
    Date: 2018-09-21
    Danish wind power company Orsted -- fka DONG Energy -- reports it will divest 50 pct of its stake in the 1,218 MW Hornsea 1 Offshore Wind Farm off the coast of Yorkshire, in the UK, to New York City-based investment fund Global Infrastructure Partners for approximately £4.46 billion ($5.85 billion. The purchase price will be paid out between 2018 and 2020.

    The sale follows Orsted's normal business practice to construct a project and sell a portion of the project to an investor at some point during construction or operation. Orsted will continue construction of the project under a EPC contract that includes long-term operations and maintenance services. When fully online in 2020, Hornsea I will be the world's largest offshore wind farm. (Source: Orsted, Various Media, CleanTechnica, 19 Sept., 2018) Contact: Orsted, Henrik Poulsen, CEO, Daniel Lerup, Inv. Relations, +45 99 55 97 22, https://orsted.com; Global Infrastructure Partners, www.global-infra.com

    More Low-Carbon Energy News Hornsea 1 Offshore Wind,  Orsted,  Offshore Wind,  


    Siemens Gamesa Joins Science Based Targets Initiative (Int'l)
    Science Based Targets Initiative
    Date: 2018-09-21
    At last week's Global Climate Action Summit held in San Francisco, Spanish wind energy giant Siemens Games Renewable Energy announced its commitment to develop a "measurable, science-based emissions reduction target" that will be independently approved and verified by the Science Based Target Initiative.

    The Science Based Targets initiative (SBTi) is a joint collaboration between the Carbon Disclosure Project, the United Nations Global Compact, World Resources Institute, the World Wide Fund for Nature, and the We Mean Business coalition, intended to encourage and support companies to commit to making measurable reductions in their carbon emission levels at a scale that actively contributes to meeting the 2 degree C warming target set in the Paris Climate Accord. Nearly 500 companies worldwide have committed to SBTI. (Source: Siemens Gamesa, SBTI, CleanTechnica, 18 Sept., 2018)Contact: Siemens Gamesa Renewable Energy, Markus Tacke, www.siemensgamesa.com; Science Based Targets initiative, info@sciencebasedtargets.org, www.sciencebasedtargets.org

    More Low-Carbon Energy News Science Based Targets Initiative,  Siemens Gamesa,  Wind,  Climate Change,  


    UK Developer Drops Harvest Wind Energy Plans (Ind. Report)
    Renewable Energy Systems
    Date: 2018-09-21
    Hertfordshire, UK-headquartered Renewable Energy System reports it has withdrawn from the proposed 600-MW Harvest Wind Energy project in northern Indiana. The proposal called for the installation 150 to 225 wind turbines in Cass and Miami counties. Thereports The company cited changes to the project's "technical circumstances" for its withdrawal, according to the Pharos-Tribune newspaper. (Source: Renewwable Energy Systems, Indianapolis Business Journal, AP, 19 Sept., 2018)Contact: Renewwable Energy Systems, +44 (0)1923 299 200, www.res-group.com

    More Low-Carbon Energy News Renewable Energy Systems,  Wind,  


    Offshore Wind Shifts in the Garden State (Reg & Leg)

    Date: 2018-09-19
    In the Garden State, the New Jersey Board of Public Utilities (BPU) reports it has unanimously agreed to accept offshore wind project proposals for a total of 1,100 MW to be sited approximately 17 to 20 miles off the New Jersey coast.

    New Jersey Legislation to develop offshore wind was passed in 2010, but the effort was stymied by then Republican Governor and presidential hopeful Chris Christie. The state's new Gov. Phil Murphy (D) revived the offshore wind initiative with a call for 100 pct clean energy by 2050. (Source: NJ PUB, KYW Radio, 17 Sept., 2018)Contact: NJ PUB, Joseph Fiordaliso, Pres., (609) 777-3300, www.bpu.state.nj.us

    More Low-Carbon Energy News Wind,  New Jersey Wind,  Offshore Wind,  


    Consumers Unveils Renewables Storage R&D Center (Ind. Report)
    Consumers Energy,Western Michigan University.
    Date: 2018-09-19
    Jackson, Michigan-headquartered Consumers Energy is reporting the launch of the Parkview Battery Storage Research and Development project at Western Michigan University in Kalamazoo

    The project is part of a Consumers Energy Clean Energy Plan calling for more solar and wind electric power generation facilities that depend on batteries to store energy.

    Consumer's picked WMU to unveil the battery after conducting a statewide search with Michigan State University. Consumers, MSU, and WMU engineering students will help with a year-long study to see how battery powered energy could be used around Michigan. (Source: Consumers Energy, WWMT.COM, 17 Sept., 2018) Contact: Consumers Energy, Patti Poppe, CEO, (517) 788-0550, info@cmsenergy.com, www.ConsumersEnergy.com

    More Low-Carbon Energy News Renewable Energy,  Energy Storage,  Consumers Energy,  


    Shanghai Electric Wind Power Installs First LM Wind Blades (Int'l)
    LM Wind
    Date: 2018-09-19
    LM Wind Power reports two sets of its wind blades have been installed on Shanghai Electric Wind Power 4.0MW-136 turbines at the first phase of the Shanghai Lingang offshore project in China.

    LM Wind Power . provided onsite support and service for the installation as part of a two-year agreement to deliver the blades during 2018 and 2019. (Source: LM Wind, Various Media, 18 Sept., 2018) Contact: LM Wind Power, Duncan Berry, CEO, +45 79 84 00 00, www.lmwindpower.com

    More Low-Carbon Energy News LM Wind,  Wind Turbine Blade,  


    BU Reports ENGIE North America 15-year Wind PPA (Ind. Report)
    Engie North America,Boston University
    Date: 2018-09-19
    Boston University reports that as part of its Climate Action Plan it will purchase 205,000 megawatt hours of wind power from Engie North America under the terms of a 15 year PPA beginning in 2020, from a South Dakota wind farm that will begin construction in the spring, 2019.

    By purchasing power outside New England, BU will earn renewable energy certificates (RECs) against its own carbon emissions in Boston. BU's Climate Action Plan aims to reduce carbon emissions to zero on BU campuses and global operations by 2040. (Source: Boston University, BU Today, 18 Sept., 2018) Contact: Boston University, Dennis Carlberg, Sustainability Dir., www.bu.edu; ENGIE North America, Matt Riley, Senior VP U.S. Wind Development, www.engie-na.com

    More Low-Carbon Energy News Engie North America,  Wind,  


    UK Wind Power Exceeds 20GW (Int'l. Ind. Report)
    RenewableUK
    Date: 2018-09-17
    RenewableUK is reportingthat with the opening of the world's largest offshore wind farm, Ørsted's 659 megawatt Walney Extension off the coast of Cumbria, the UK's onshore and offshore wind energy industry now exceeds 20 gigawatts of capacity; enough to power more than 14 million homes, cutting carbon emissions by 25 million tonnes a year.

    The UK's first commercial onshore wind farm, Delabole in Cornwall, went operational in 1991, and the first offshore project in Blyth began generating in 2000 Every credible future energy scenario envisages renewables generating well over 50 per cemt of our electricity by 2030 - some forecast we'll be providing more than 70 per cent. (Source: RenewableUK, 17 Sept., 2018) Contact: RenewableUK, RenewableUK, Hugh McNeal, CEO, Maf Smith , Deputy CEO, +44 (0) 20 7901 1300, info@renewableuk.com, www.renewableuk.com

    More Low-Carbon Energy News RenewableUK,  Wind,  Offshore Wind,  Renewable Energy,  


    Hoover Dam Pumped Energy Storage Project Proposed (Ind. Report)
    Los Angeles Department of Water and Power
    Date: 2018-09-17
    In the Golden State, the Los Angeles Department of Wind and Power (LADWP) is floating a proposal that, if approved, would construct a wind and solar-powered pump station 20 miles south of the Hoover Dam. The station would pump water from downstream back up to Lake Mead, which was created by the dam. All the water stored at the lake could then be released as needed for power on demand, effectively turning the dam into a battery for solar and wind power.

    The Hoover Dam water load currently functions at about 20 pct of its full capacity. Research committees are presently evaluating the environmental and infrastructural impacts of the project. If approved, the LADWP hopes to complete the project by 2028.

    Hoover Dam is a concrete arch-gravity dam in the Black Canyon of the Colorado River, on the border between the U.S. states of Nevada and Arizona. It was constructed between 1931 and 1936 during the Great Depression and was dedicated on September 30, 1935, by President Franklin D. Roosevelt.(Source: LADWP Good News Network, 16 Sept., 2018) Contact: LADWP, David H. Wright, GM, (800) 342-5397, www.ladwp.com; Hoover Dam, www.usbr.gov/lc/hooverdam

    More Low-Carbon Energy News Pumped Energy Storage,  Los Angeles Department of Water and Power,  Pumped Energy Storage Renewable Energy,  Energy Storage,  


    SSE Seeks Scottish Wind Farm Repowering Approval (Int'l Report)
    SSE Plc
    Date: 2018-09-17
    UK energy utility SSE Plc reports it has submitted an application with the Scottish Ministers seeking permission for a planned repowering of a 18.7-MW wind farm in Scotland to 80 MW the capacity .

    SSE plans to replace the existing 22 turbines of its Tangy Wind Farm on the Kintyre peninsula with 16 newer and more efficient machines. The expansion project, called Tangy III, was previously approved in 2015 as a 15-turbine scheme. The original 22-turbine Tangy Wind Farm has been online since 2004.(Source: SSE, Renewables Now, 17 Sept., 2018) Contact: SSE, www.sse.com

    More Low-Carbon Energy News SSE Plc,  Wind,  


    Biogas Essential to Ireland's Future Circular Economy(Int'l)
    University College Cork
    Date: 2018-09-17
    Speaking at the recent SEAI/ International Energy Agency Bioenergy Symposium on Anaerobic Digestion in the Circular Economy at the University College Cork (UCC), Professor Jerry Murphy called for decarbonization of Ireland's gas system in order to achieve the "circular economy" objectives as laid out in the government's €21.8 billion National Development Plan.

    "Biogas plants cannot be directly compared to other renewable energy sources like wind turbines, which produce electricity, according to Prof. Murphy, Director of the SFI MaREI Centre headquartered at the University College Cork (UCC) Environmental Research Institute and Leader of the International Energy Agency Biogas Task. "There are so many more advantages to a biogas system -- from waste treatment, production of bio-fertilizer, generation of a renewable energy suitable for transport, heating or electricity, improved water quality and provision of jobs in rural communities. It is the full package."

    In 2018, Gas Networks Ireland will introduce biogas onto the Irish gas network for the first time and they have a target of at least 20 pct of all gas used in Ireland to be renewable (decarbonized) by 2030. A significant aspect of this rollout will take place in the transport sector under the €25 million EU-funded Causeway project which aims to provide a sustainable, clean alternative to diesel for Ireland's transport operators. (Source: Gas Networks Ireland, TheCork.ie, 17 Sept., 2018)Contact: Gas Networks Ireland, www.gasnetworks.ie; Environmental Research Institute -- University College Cork, +353 21 490 1931, eri@ucc.ie, http://eri.ucc.ie, www.ucc.ie/en/eri

    More Low-Carbon Energy News Biogas,  Anaerobic Digestion,  


    Echoenergia Snares Voltalia 197MW Brazilian Wind Projects (M&A)
    Voltalia, Echoenergia
    Date: 2018-09-14
    In Paris, French renewable energy company Voltalia is reporting the sale of 197MW of shovel-ready wind farm projects to private equity firm Actis Group's Brazilian-controlled company Echoenergia. Financial details have not been disclosed.

    The firms have also entered a partnership which gives Sao Paulo-based Echoenergia access to a series of ready-to-build future wind projects of up to 500MW in North Eastern Brazil. Echoenergia currently has 700MW of installed capacity in the Northeastern states of Brazil. Voltalia owns a total installed capacity of 524MW. (Source: Voltalia, Power Tech., 12 Sept., 2018) Contact: Echoenergia, +55 11 4935-4000, www.echoenergia.com.br/en/quem-somos/a-echoenergia; Voltalia, Sebastien Clerc, CEO, +33 1 81 70 37 00, accueil.paris@voltalia.com, www.voltalia.com

    More Low-Carbon Energy News Voltalia ,  Wind,  Echoenergia,  


    Google Data Center Inks Finnish Wind Energy PPA (Int'l Report)
    Google
    Date: 2018-09-14
    Reuters is reporting IT juggernaut Google has signed a 10-year PPA for renewable energy from three new wind farms presently under construction in Finland. The combined capacity of the three farms will be 190 MW and will be built by renewable energy developers Neoen of France and Germany's CPC and WPD.

    Google's Finnish data centre is situated in a former paper mill built originally in the 1950s and uses water from the Baltic Sea for cooling. According to Google, the Finnish deal is the first where it is purchasing power from European projects that will not receive any government subsidies.(Source: Reuters, Gadgets 360, 12 Sept., 2018)

    More Low-Carbon Energy News Google,  Wind,  


    Quinbrook's Persimmon Creek Wind Farm Now Online (Ind. Report)
    Quinbrook Infrastructure Partners,Scout Clean Energy
    Date: 2018-09-14
    Global investment management company Quinbrook Infrastructure Partners reports it has begun commercial operations at its 200MW Persimmon Creek wind farm in Oklahoma. The 17,000 acres facility incorporates 73 GE 2.5MW turbines.

    The project is a JV between Quinbrook and Elawan Wind, US, and was constructed by Florida-based firm Wanzek Construction. The project was financed with equity investments from Quinbrook and Elawan along with tax equity investments from a consortium comprising of GE Energy Financial Services and JP Morgan. To be initially operated under a GE Full Service Operations and Maintenance (O&M) Agreement, Persimmon is reported to be the first project to be completed by the Boulder, Colorado-based wind energy developer and owner-operator Scout Clean Energy. (Source: Quinbrook Infrastructure Partners, power Tech, 13 Sept., 2018) Contact: Quinbrook Infrastructure Partners, (713) 580- 8022, www.quinbrook.com; Scout Clean Energy, Micheal Rucker, Pres., (303) 284-7566, info@scoutcleanenergy.com, www.scoutcleanenergy.com

    More Low-Carbon Energy News Scout Clean Energy,  Wind,  


    €250Mn Latvian Wind Farm in Planning Stage (Int'l Report)
    Eolus Vind
    Date: 2018-09-14
    SIA Eolus, a subsidiary of Hassleholm,Sweden-based Eolus Vind AB, has announced plans to construct a €250 million wind farm in Dobele and Tukums municipalities, Latvia. The project will utilize 51 turbines with an annual electricity production at 0.7 TWh -- about 10 pct of Latvia's yearly energy consumption. Construction is expected to get underway in 2019 for completion and commissioning in 2022.

    Eolus Vind AB is one of the largest wind farm operators in Sweden, having built 540 out of the country's 3400 wind turbines. (Source: Eolus Vind AB, PR, Public Broadcasting Latvia, 13 Sept., 2018) Contact: Eolus Vind AB, Per Witalisson, CEO, +46 10 199 88 02, www.eolusvind.com

    More Low-Carbon Energy News Wind,  Eolus Vind,  


    Siemens Scores UK Offshore Wind Grid Connection Contract (Int'l)
    Siemens.Triton Knoll
    Date: 2018-09-12
    Siemens Energy Management reports it will soon begin onshore substation and offshore transformer module design, supply and construction work on the UK's Triton Knoll offshore wind farm. The new wind farm will be capable of providing sufficient clean and sustainable power for the equivalent of at least 800,000 British homes.

    Siemens was awarded a contract from its German customer Innogy SE, to design, supply and build the grid connection for the 860 MW wind farm 32 km off the Lincolnshire coast.

    Siemens will lead on the construction of a new four-hectare onshore substation at Bicker Fen, as well as offshore infrastructure, including two Offshore Transformer Modules (OTM). Work is already underway on a new bell mouth entry point and 3.8 km access road to the new substation construction site. The onshore substation construction will start early 2019. (Source: Siemens Energy Management, T&D World, 11 Sept., 2018) Contact: Siemens Grid Access, www.siemens.com/gridaccess; Siemens Energy Management, www.siemens.com/energy-management; Innogy Renewables UK, +44 1793 877777, www.innogy.com/web/cms/en/3708678/innogy-renewables-uk

    More Low-Carbon Energy News Siemens,  Offshore Wind,  Triton Knoll ,  


    Notable Quote on Climate Change
    Climate Change
    Date: 2018-09-12
    "Climate change is moving faster than we are. We need to put the brake on deadly greenhouse gas emissions and drive climate action."

    "These (2015 Paris Climate Agreement) targets were the bare minimum to avoid the worst impacts of climate change, but scientists tell us that we are far off track. According to a U.N. study, the commitments made so far by parties to the Paris agreement represent just one-third of what is needed."

    "We need to rapidly shift away from our dependence on fossil fuels. We need to replace them with clean energy from water, wind and sun. We must halt deforestation, restore degraded forests and change the way we farm."

    "If we do not change course by 2020, we risk missing the point where we can avoid runaway climate change, with disastrous consequences for people and all the natural systems that sustain us. Keeping our planet's warming to well below 2 degrees (Celsius) is essential for global prosperity, people's well-being and the security of nations." -- UN Secretary-General Antonio Guterres.

    (Source: UN Secretary-General Antonio Guterres, 10 Sept., 2018)

    More Low-Carbon Energy News Carbon Emissions,  Climate Change,  Paris Climate Agreement,  


    Vestas' Russian Wind Blade Plant Construction Nears Completion (Int'l)
    Vestas,Rusnano
    Date: 2018-09-12
    The Russian Association of the Wind Industry is reporting Vestas' new RUB 1 billion ($14.3 million) wid turbine blade which is under construction in Ulyanovsk, southern Russia, is nearing completion and expects to begin manufacturing 300 blades per year early in 2019.

    Vestas presently produces nacelles for its 4MW platform at its factory in the neighbouring province of Nizhny Novgorod, and plans to set up a tower facility in Rostov, as part of its efforts to create a manufacturing hub in south-west Russia. Vestas partnered with Rusnano and the Consortium of Investors of Ulyanovsk Oblast to build the blade factory. (Source: Vestas, Russian Association of the Wind Industry, Vestas, WindPower Monthly 11 Sept., 2018)Contact: Russian Association of the Wind Industry, https://rawi.ru/en; Vestas, +45 9730 0000, www.vestas.com; Rusnano, en.rusnano.com

    More Low-Carbon Energy News Rusnano,  Vestas,  Wind Turbine,  Wind Blade,  


    ACCIONA Awarded 35-Turbine Aussie Wind Farm (M&A, Int'l)
    ACCIONA Energía
    Date: 2018-09-12
    ACCIONA Energia reports it will acquire the 157.5-MW Mortlake South wind farm in Victoria State, Australia, following an award in the renewable energy tender called by the State Government of Victoria.

    The 35, 4.5-MW Nordex wind turbine equipped Mortlake South wind farm represents capital expenditure of $288 million (AUS) (€177 million). Construction is slated to get underway early next year for completion in mid-2020.

    The Mortlake acquisition will increase ACCIONA'S Australian renewable energy capacity 36 pct to 592 MW. The wind farm will generate clean energy equivalent to the electricity consumption of almost 80,000 Australian households, avoiding over 532,000 tpy of CO2.

    To date, ACCIONA Energia has invested more than $1.3 billion (€814 million) in Australia since 2002. (Source: ACCIONA Energia , PR, REVE, 11 Sept., 2018) Contact: ACCIONA Energia, www.acciona-energia.com

    More Low-Carbon Energy News ACCIONA Energía ,  Wind,  Australia Wind,  


    Cleantech Solar, Climate Fund Managers Partnering (Ind. Report)
    Cleantech Solar
    Date: 2018-09-12
    Cleantech Solar, a pan-Asian supplier of renewable energy to corporates, is reporting receipt of a $50 million equity investment from Climate Fund Managers (CFM), the climate-dedicated investment manager and manager of the Climate Investor One facility. The investment is intended to facilitate Cleantech Solar's installed solar capacity growth in the Commercial and Industrial sector to over 450 MW with a target to generate over 600 GWh of clean electricity per annum.

    Climate Fund Managers, with the support of the Dutch Development Bank, FMO, and Sanlam InfraWorks, will help Cleantech Solar access prime, long-term institutional capital for future expansion.

    Singapore-based Cleantech Solar owns and operates over 120 solar power plants across India and South-East Asia, representing 200 MW of projects, with majority being in operation and remaining under construction and development.

    Climate Fund Managers (CFM) is a cooperative established as a joint venture between the Dutch Development Bank, FMO, and South Africa's Sanlam InfraWorks.

    Climate Investor One, which has $535 million funds under management, is mandated to finance renewable energy infrastructure projects across Africa, Asia and Latin America with a technological focus on solar, wind and run-of-river hydro. (Source: CleanTech Solar, eco Business, 11 Sept., 2018) Contact: Climate Fund Managers, Andrew Johnstone, CEO, www.climatefundmanagers.com; Cleantech Solar , www.cleantechsolar.com

    More Low-Carbon Energy News Cleantech Solar,  Run of River Hydro,  ,  


    Eolus Acquires 500MW/250MW US Solar-Energy Storage Project (M&A)
    Eolus
    Date: 2018-09-12
    Swedish commercial wind power developer Eolus Wind AB, through its subsidiary Eolus North America, is reporting acquisition of an unidentified western US solar-plus-storage mega-project currently in development.

    The project, which "has an interconnection queue to deliver power to California," is expected to come online in 2022, when it should also begin commercial operation. (Source: Eolus, Energy Storage, 11 Sept., 2018) Contact: Eolus Vind AB, Per Witalisson, CEO, +46 10 199 88 02, www.eolusvind.com

    More Low-Carbon Energy News Eolus,  Solar,  


    Carlyle Group Acquiring 612-MW NY Wind Portfolio (M&A)
    Carlyle Group,Noble Environmental Power
    Date: 2018-09-10
    Asset manager The Carlyle Group reports will purchase a 612-MW operating wind power generation portfolio in New York plus a dedicated operations platform in what it describes as its “maiden foray” into wind power. The purchase, which is subject to regulatory and other approvals, will be executed by its newly-established affiliate Zephyr Wind Energy, the announcement says. The vendor is Essex, Ct.-based Noble Environmental Power.

    The acquisition includes three wind farms in Clinton County totalling 279 MW, two in Wyoming County with a combined capacity of 227 MW and a single 106-MW wind park in Franklin County. Together, these plants currently produce 29 pct of the Empire State's wind power. The transaction is awaiting certain regulatory approvals and is scheduled for completion in the fourth quarter of 2018. Carlyle Power Partners II LP will provide equity capital for the purchase. Upon completion of the move, Carlyle Power Partners' total power generation portfolio will reach 7,000 MW net MW. (Source: Carlyle Group, PR, Renewables, 7 Sept., 2018) Contact: Carlyle Group, www.carlyle.com; Noble Environmental Power, (860) 581-5010, www.noblepower.com

    More Low-Carbon Energy News Noble Environmental Power,  Wind,  


    Orsted's Walney Extension UK Offshore Wind Farm Now Online (Int'l)
    Orsted
    Date: 2018-09-10
    In the UK, Danish energy company Orsted -- fka DONG ENERGY -- reports its 87 turbine Walney Extension offshore wind farm north of Blackpool in the Irish Sea is now online. The project, which officially went into service last Thursday, generates 659 mw of power.

    Nearly half of the Walney Extension wind farm incorporates 8.25-mw MHI Vestas turbines. The rest of the installation is composed of slightly smaller 7-mw models from Siemens. The wind farm covers an area of water measuring 55.9 square miles, or 35,830 acres. (Source: Orsted, NPR, 7 Sept., 2018) Contact: Orsted, Henrik Poulsen, CEO, Daniel Lerup, Inv. Relations, +45 99 55 97 22, https://orsted.com

    More Low-Carbon Energy News Orsted,  MHI Vestas,  Offshore Wind,  


    WPD Establishes Japanese Subsidiary (Int'l. Report)
    WPD Group
    Date: 2018-09-07
    In Germany, Bremen-based wind power developer WPD Group reports the establishment of WPD Japan Co., Ltd. in Tokyo in January 2018. The company is seeking to develop both on- and offshore wind projects in Japan. The expansion was supported by the Japan External Trade Organization.

    WPD Japan, which entered the Taiwan market in 2003 and the United States in 2007, seeks to develop both on and offshore wind projects in Japan The company presently has installed 2,180 wind turbines in 18 countries with a total installed capacity is over 4,400 MW. (Source: WDP, Japan External Trade Organization, Sept., 2018) Contact: WPD Group, 49 (421) 16866-10, www.wpd.de/en/star; Japan External Trade Organization, www.jetro.go.jp/en

    More Low-Carbon Energy News WPD Group,  Wind,  Offshore Wind,  


    Goldwind Offloading Aussie Solar, Wind Project Pipeline (Int'l)
    Goldwind
    Date: 2018-09-07
    Chinese wind turbine supplier and project developer Goldwind reports it is seeking a purchaser for its wind and large-scale solar development pipeline in the Land Down Under. Goldwind's planed exit from the Australian market may be partially attributed to the government's failed National Energy Guarantee (NEG) policy which the Australian electricity marketplace without an effective policy setting beyond 2020.

    Goldwind Australia aims to sell the portfolio in full or part before the end of November, this year. (Source: Goldwind Australia, Various Media, PV Mag Australia, 5 Sept., 2018) Contact: Goldwind Energy, +61 (2) 9008 1715, info@goldwindaustralia.com, www.goldwindaustralia.com

    More Low-Carbon Energy News Goldwind,  Wind,  Solar,  


    NY Commits $15Mn to Clean Energy Workforce Programs (Funding)
    Gov. Andrew M. Cuomo
    Date: 2018-09-07
    In the Empire State, democratic Gov. Andrew M. Cuomo's, office has announced $15 million in support of two initiatives that will promote clean energy workforce development and training programs on State University of New York (SUNY) campuses.

    Nearly $6 million was awarded to SUNY campuses to train more workers in the clean energy sector. In addition, a request for proposals (RFP) was made available to all SUNY campuses for grants totaling $9 million to provide apprenticeships, internships, and educational programs and support through industry partnerships.

    Of the awarded proposals, SUNY Canton will enhance its Solar Ready Vets program on-site at Fort Drum. Its training provides a micro-credential program in renewable energy specifically for veterans transitioning to civilian life. In another award, the SUNY Maritime Offshore Energy Center will develop a wind operations technician training program. As part of the $9 million RFP for additional grants, the SUNY system will explore opportunities for partnerships with state and local agencies, including the Department of Labor, NYSERDA, Empire State Development and Industrial Development Agencies. (Source: Office of NY Gov. Andrew M. Cuomo, Windpower , Sept., 2018) Contact: Office of NY Gov. Andrew M. Cuomo, www.ny.gov/agencies/office-governor; NYSERDA, Alicia Barton, Pres., CEO, (518) 862-1090, www.nyserda.ny.gov; SUNY, Kristina Johnson, Chancellor, www.suny.edu

    More Low-Carbon Energy News NYSERDA,  SUNY,  Renewable Energy,  Wind,  Solar,  


    Triton Knoll Offshore Wind Farm Reaches Financial Close (Int'l)
    innogy SE,MHI Vestas
    Date: 2018-09-07
    Further to our 22nd August coverage, German energy developer Innogy SE is reporting its 860 MW Triton Knoll Offshore Wind Farm has reached financial close. The project will incorporate 90, MHI Vestas wind turbines and will supply 100 pct of its power output to Orsted through under the terms of a 15-year PPA.

    innogy SE acquired the Triton Knoll project from its parent company, Frankfort Germany-headquartered RWE and acquired a 50 pct stake from Norwegian renewable energy company Statkraft. In August, innogy sold a 41 pct stake in the project to two Japanese electric utilities, J-Power and Kansai Electric Power. The project is expected to be commissioned in 2021.(Source: innogy SE, CleanTechnica, 5 Sept., 2018) Contact: RWE Innogy, Peter Terium, CEO, +49 (0) 201 122 2088, www.rwe.com; Innogy Renewables UK, +44 1793 877777, www.innogy.com/web/cms/en/3708678/innogy-renewables-uk; MHI Vestas, +81.3.6716.3111, www.mhi.co.jp

    More Low-Carbon Energy News Innogy SE,  Triton Knoll ,  Offshore Wind,  MHI Vestas,  


    O-WIND Omnidirectional Wind Turbine Touted (New Prod & Tech)
    Lancaster University,
    Date: 2018-09-07
    In the UK, Lancaster University students Nicolas Orellana and Yaseen Noorani are touting their new O-Wind Turbine -- an omnidirectional wind turbine ideally suited for cities and other areas where uncertain wind speed and direction prevails. The students and their O-Wind Turbine are the winners of the 2018 James Dyson Award.

    The O-Wind Turbine is a 25cm sphere with geometric vents mounted on a fixed axis. It can be used as a direct source of power or it can be fed into the electricity grid. According to the designers, the technology can be used for developing on-grid and off-grid alternatives for the urban market as well as for motor homes, boats and other stand-alone applications of various sizes. (Source: Lancaster University, RE Mag, 5 Sept., 2018) Contact: Lancaster University, +44 (0) 1524 65201, www.lancaster.ac; James Dyson Award, www.jamesdysonaward.org

    More Low-Carbon Energy News Wind,  Wind Turbine,  


    Nordex Scores 99 MW Argentinian Wind Project Order (Int'l Report)
    Nordex,AES Argentina Generacion
    Date: 2018-09-05
    German wind turbines maker Nordex Group is reporting receipt of an order for 30 units of its AW132/3300 turbines from AES Argentina Generacion S.A., a subsidiary of the energy provider AES Corp. A 20-year service agreement is included in the contract.

    The 99 MW wind farm is located in the Province of Buenos Aires near Bahia Blanca, Argentina. Nordex will manufacture the 120-meter concrete towers and the wind turbines in Argentina. (Source: Nordex, Sept., 2018) Contact: Nordex, Jose Luis Blanco, CEO, +49 381 6663 3300, www.nordex-online.com; AES Argentina Generacion, +54 336 448-7100, rrii@aes.com, www.aesargentina.com.ar

    More Low-Carbon Energy News Nordex,  Wind Turbine,  


    Statkraft Enables Wind Operations After Subsidies Expiration (Int'l)
    Statkraft
    Date: 2018-09-05
    Oslo-headquartered Norwegian wind industry major Statkraft reports it and six community wind farms have agree on PPAs with German industrial companies for 31 wind turbines. This will allow these wind farms in Germany to continue operating in the long term after the end of EEG funding.

    EEG funding for around 6,000 German wind turbines will expire on 1 January 2021. This corresponds to a total installed capacity of approximately 4,500 mw -- sufficient power for around 2.1 million households.

    According to current data, around 14,000 wind turbines with a total installed capacity of around 17,000 mw will no longer receive EEG subsidies in the period 2021 to 2026. This corresponds to more than one third of the onshore wind power currently installed in Germany. and, since wind farms are no longer eligible for EEG subsidies after 20 years, wind farm operators must submit a stability assessment and find alternative sales channels for the electricity. (Source: Statkraft, PR, 3 Sept., 2018) Contact: Stakraft, +47 24 06 70 00, www.statkraft.com

    More Low-Carbon Energy News Statkraft,  Wind,  


    Zambian RfP Seeks 100 MW of Solar Energy (Int'l Report)
    Zambia ,African Development Bank
    Date: 2018-09-05
    Via the tender, selected developers will be awarded 25-year PPAs for the sale of power to local utility, ZESCO. In Lusaka, the Zambian Ministry of Energy and the GET FiT Zambia Secretariat have issued a Request for Proposal (RfS) for the deployment of 100 MW of solar PV capacity The RfP follows the Request for Qualification phase, which was concluded in June and saw the shortlisting of 10 developers including Enel Green Power, Engie, EDF, and others. Selected developers will be granted a 25-year PPA by the local utility ZESCO.

    The tender is being held under the framework of the Zambian REFiT Strategy, an initiative developed with the support of German development bank, KFW. The REFiT program aims to initially tender up to 100 MW of PV and envisages the deployment of 200 MW small- and medium-scale renewable energy projects, up to a maximum size of 20 MW. Eligible renewables include solar PV, hydro, geothermal, biomass, waste energy and wind power. The Department of Renewable Energy and Energy Efficiency at the African Development Bank has issued an expression of interest to arrange debt financing for the five 20 MW IPP solar projects. The Zambian government is aiming to deploy 500 MW of solar PV over the next few years. (Source: Zambia Ministry of Energy, PV Mag, September 3, 2018) Contact: Zambia Ministry of Energy, www.mewd,gov.zm; African Development Bank, Amadou Hott, VP Power, Energy, Climate and Green Growth, +225 2026 3900, www.afdb.org/en

    More Low-Carbon Energy News Solar,  African Development Bank,  

    Showing 1700 to 1750 of 1940.

    Go to page:
    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39