Return to Today's Publications

 

Newsletter:
Date Range (YYYY-MM-DD) -
Company, Industry or Technology:
  Search Tips


ABB, Energon Boosting Bangladesh Solar Plant Efficiency (Int'l)
ABB,Energon,ORION
Date: 2020-08-26
ABB Group reports it has contracted with independent power producer ORION to implement automation and control solutions at the 100 MW Moidhara solar power plant in Mongla, Bangladesh.

ABB will collaborate with ORION subsidiary Energon Renewables which will use efficient "mono Perc" high efficiency solar cells to capture solar rays and convert to power which would be then supplied at 132 kV AC voltage to the main grid in Mongla, 13km aray.

ABB will implement a fully integrated automation and electrical system to monitor and maximize the plant's efficiency and reliability. ABB will also supply the complete electrical solution comprising of transformers, RMUs and 33/132 kV substation along with the SCADA system communicating to the Bangladesh grid via IEC 60870-5-104 communication protocol. (Source: ABB, ORION, Energon Renewables, PEI, 25 Aug., 2020)Contact: ABB,India, +91 80 67 143 000, contact.center@in.abb.com, www.abb.com

More Low-Carbon Energy News ABB,  Energon,  ORION,  Energy Efficiency,  

Showing 1 to 1 of 1.