Return to Today's Publications

 

Newsletter:
Date Range (YYYY-MM-DD) -
Company, Industry or Technology:
  Search Tips


Azelio Touts Low-Cost Solar Energy Storage (New Prod. & Tech.)
Azelio
Date: 2018-06-18
Gothenburg, Sweden-headquartered Azelio -- fka Cleanergy -- is reporting the recent launch of a demo unit of its solar energy storage technology. Based on Stirling Concentrated Solar Power (CSP) with multi-hour Thermal Energy Storage (TES), Azelio modular technology is suitable for small to very large installations with maintained low cost and high efficiency.

Azelio's technology uses aluminum alloy as a storage media that does not need refilling to maintain its efficiency, as opposed to common storage technologies using salt or water.

Initially, Azelio is targeting projects in 500 kW to 20 MW range and plans to construct a verification project in Moracco in partnership with the Moroccan Agency for Sustainable Energy. (Source: Azelio, TradeArabia , 17 June, 2018) Contact: Azelio, Jonas Eklind, CEO, +46-709-40-35-80 jonas.eklind@azelio.com, www.azelio.com

More Low-Carbon Energy News Cleanergy,  CSP,  Solar,  Energy Storage,  


Cleanergy's $575Mn Stirling CSP Project Underway in China (Int'l)
Cleanergy,Datang Holdings New Energy Technologies.
Date: 2017-06-21
Goteborg, Sweden-based Stirling engine-based renewable energy solutions provider Cleanergy AB reports it has begun installation of its Stirling concentrated solar power (CSP) technology in China, for a 200MW project for Beijing-based Datang Holdings New Energy Technologies. The $575 million deal included the manufacturing, installation and development of Cleanergy's advanced Stirling CSP technology in China.

Cleanergy's GasBox waste-to-energy system is installed in a modular container and converts methane gas into electricity. The GasBox is an autonomous and flexible Stirling Engine unit incorporated with a real-time power management system with remote access and optional grid functionality. The firms will initially install 50MW capacity in 2018, while the remaining 150MW will be installed as a second step that includes energy storage. (Source: Cleanergy, June, 2017) Contact: Cleanergy, Jonas Eklind, CEO, Alexander Vestin, SVP, Bus. Dev., +46 70 566 7000, alexander.vestin@cleanergy.com, www.cleanergy.com; Datang Holdings New Energy Technologies, www.cccme.org.cn

More Low-Carbon Energy News Cleanergy,  CSP Solar,  Stirling Engine,  

Showing 1 to 2 of 2.