Return to Today's Publications

 

Newsletter:
Date Range (YYYY-MM-DD) -
Company, Industry or Technology:
  Search Tips


Azelio TES.POD Production Underway (Int'l. Report))
Azelio
Date: 2021-09-27
Production in volume design of Azelio's long-duration energy storage TES.POD has started according to plan. To ensure high quality in both the product and the supply chain, consisting of around seventy European suppliers, production will begin at a low pace before scaling up to high volumes in 2022.

The production chain consists of the assembly of cylinder kits in the company's facilities in Amal, (Sweden), followed by the final assembly of a complete Stirling engine in its factory in Uddevalla (Sweden). The thermal energy storage unit is assembled by AQ Systems in Vaggeryd (Sweden) then married on site.

To date, Azelio has secured orders for two TES.POD units in Sweden and one unit in Dubai, as well as a conditional order from Egypt for twenty TES.POD units, corresponding to 260 kW of electrical output and 3.3 MWh of storage capacity. The company's goal for 2021 is to sign and begin delivery of one or two 100 kW or larger projects. (Source: Azelio, PR, Website, 22 Sept., 2021) Contact: Azelio, Jonas Eklind, CEO, +46 709 40 35 80 jonas.eklind@azelio.com, www.azelio.com

More Low-Carbon Energy News Azelio,  Energy Thermal Energy Storage,  Storage,  Stirling Engine,  


Azelio Scores Egyptian Energy Storage Order (Int'l. Report)
Azelio
Date: 2021-08-20
Swedish energy storage company Azelio reports receipt of an order totaling $1.5 million from Giza,Egypt-based project developer Engazaat Development SAE for 20 of its TES.POD renewable energy storage units with a combined capacity of 3.3 MWh. The order is conditional on the results of an ongoing project feasibility study.

The TES.POD units will be delivered in December 2021 and will be used for a mini-grid system as part of the SAVE sustainable agriculture initiative which aims to cover 85 pct of the power needs of farmers in the in Moghra Oasis, Egypt. (Source: Azelio, PR, 19 Aug., 2021) Contact: Azelio, Jonas Eklind, CEO, +46 709 40 3580, jonas.eklind@azelio.com, www.azelio.com; Engazaat Development, +202 3539 2055, F: +202 3539 2056, info@engazaat.com, www.engazaat.com/home

More Low-Carbon Energy News Azelio,  Battery,  Energy Storage,  


Azelio, MMR Energy Storage Collaboration Announced (Ind. Report)
Azelio,MMR Constructors
Date: 2021-06-30
Gothenburg, Sweden-headquartered Stirling Engine and solar energy specialist Azelio is reporting a MoU with Baton Rouge, La.-headquartered MMR Group (MMR) for the development of projects combining Azelio's TES.POD® energy storage system with solar PV. The collaboration aims at an installed capacity of 250 MWh of Azelio's TES.POD by 2027, starting with a small scale installation in 2022.

Azelio's TES technology stores energy as heat in a phase change material (PCM) made of an aluminium alloy heated to 600 degrees C, which is then converted to electricity using a Stirling engine. Azelio claims the technology can enable 13 hours' duration of electricity storage as well as provide heat on demand, is effective in hot or cold climates and has an expected system lifetime of 30 years, according to the release. Azilio's patent portfolio includes specific components critical to the performance of the company's Stirling engine as well as details in the design and functioning of the energy storage. In total, Azelio has 13 approved patents, 15 patent applications pending and is preparing patent applications for further innovation

MMR Group is an instrumentation and electrical construction, maintenance, and technical services provider with a global footprint of projects completed in 36 countries.

(Source: Azelio, Website, PR, 28 June, 2021) Contact: Azelio, Jonas Eklind, CEO, +46 709 40 3580, jonas.eklind@azelio.com , www.azelio.com; MMR Group,225-756-5090, www.mmrgrp.com

More Low-Carbon Energy News Solar,  Stirling Engine,  Azelio,  Energy Storage,  


Azelio Claims Swedish Solar Energy Storage Order (Int'l.)
Azelio
Date: 2021-03-31
Azelio reports receipt of and order for two of its TES.POD® energy storage units from Swedish-based Industrisi Amal AB.

Azelio's TES.POD will store surplus energy from a 446 kW rooftop solar PV system. The installation will increase the projects renewable energy supply capacity by 24 pct and reduce CO2 emissions from energy use by 168 tpy.

The system will combine the TES.POD with solar PV already installed by Svea Solar -- Sweden's largest solar PV installer and current collaborator with Azelio for joint projects. (Source: Azelio, Website PR, 29 Mar., 2021) Contact: Azelio, Jonas Eklind, CEO, +46 709 40 35 80 jonas.eklind@azelio.com, Ralf Wiesenberg - VP Business Development, +34 699 30 86 36, ralf.wiesenberg@azelio.com, www.azelio.com

More Low-Carbon Energy News Azelio,  Energy Storage,  Solar,  


Energy Storage Startup Scores First Commercial Order (Int'l.)
Azelio
Date: 2020-12-28
Gothenburg, Sweden-based energy storage specialist Azelio reports it will see its long-duration Thermal Energy Storage (TES) technology used at the Mohammed bin Rashid Al Maktoum Solar Complex (MBR) in Dubai, UAE.

Azelio's TES technology stores energy as heat in a phase change material (PCM) made of an aluminium alloy heated to 600 degrees Celsius, which is then converted to electricity using a Stirling engine. Azelio claims the technology can enable 13 hours' duration of electricity storage as well as provide heat on demand, is effective in hot or cold climates and has an expected system lifetime of 30 years, according to the release.

Azilio's patent portfolio includes specific components critical to the performance of the company's Stirling engine as well as details in the design and functioning of the energy storage. In total, Azelio has 13 approved patents, 15 patent applications pending and is preparing patent applications for further innovations. (Source: Azelio, PR, 28 Dec., 2020) Contact: Azelio, Jonas Eklind, CEO, +46 532 100 20, info@azelio.com, www.azelio.com

More Low-Carbon Energy News Azelio,  Energy Storage,  


Azelio Scores Energy Storage Patents (Int'l. Report)
Azelio
Date: 2020-12-02
Gothenburg, Sweden-based energy storage specialist Azelio has been granted four new patents relevant to to innovations to efficiently store energy and generate electricity from heat, which is central to being able to store renewable energy.

Two of the patents relate to the design of the storage unit itself, while two concern the company's Stirling engine. The patents extend to the years 2040 and 2039, respectively. The company intends to extend the patent protection for the technologies in several geographies on the basis of these patents.

The company's patent portfolio includes specific components critical to the performance of the company's Stirling engine as well as details in the design and functioning of the energy storage. In total, Azelio has 13 approved patents, 15 patent applications pending and is preparing patent applications for further innovations.

Azelio's unique solution, the TES.POD®, stores energy in recycled aluminum at 600 degrees. The energy is converted on demand to electricity and to 55-65 degree heat via a Stirling engine. The system is very competitive with a total efficiency of up to 90 pct from electricity to outgoing energy. (Source: Azelio, Website PR, 30 Nov., 2020) Contact: Azelio, Jonas Eklind, CEO, +46 532 100 20, info@azelio.com, www.azelio.com

More Low-Carbon Energy News Azelio,  Energy Storage,  Renewable Energy,  


Siemens Gamesa Claims 473-MW Indian Turbine Order (Int'l. Report)

Date: 2020-08-19
Siemens Gamesa Renewable Energy SA reports receipt of a firm order from Indian renewables developer Adani Green Energy Ltd for 215 units of SG 2.2-122 turbines totaling 473 MW for Adani's wind project in Fatehgarh , Rajasthan state, India. The order includes supply, installation and pre-commissioning. . The wind farm is expected to be commissioned and online in September 2021. (Source: Siemens Gamesa, Renewables, 17 Aug., 2020) Contact: Adani Green Energy More Low-Carbon Energy News Siemens Gamesa news, Wind news, Adani Green Energy news, Philadelphia Energy Launches Second Annual Solar Week (Ind. Report) In the Keystone State, the Philadelphia Energy Authority (PEA) is reporting the launch of its second annual “Solarize Philly” program that provides free remote solar assessments and a new Solar Savings Grant Program to households of all income levels. The program , which is the largest of its kind in the nation, has facilitated a $10 million investment in Philadelphia's clean energy economy since 2017.

PEA also heads up Bright Solar Futures, a workforce development program aimed at establishing the nation's first Solar Energy Career and Technical Education (CTE) program, with U.S. DOE support and PECO utility sponsorship.

The Philadelphia Energy Authority (PEA) is an independent municipal authority created in 2010 to advance clean and affordable energy goals for the City. PEA has facilitated over $100 million in clean energy projects in Philadelphia since 2017, creating more than over 1,000 jobs. PEA’s $1 billion Philadelphia Energy Campaign, which launched in 2016, will create 10,000 jobs by 2026 through the implementation of clean energy and energy efficiency projects. (Source: Philadelphia Energy Authority, PR, 14 Aug., 2020) Contact: Philadelphia Energy Authority, www.philaenergy.org; Solarize Philly, www.solarizephilly.org More Low-Carbon Energy News Solarize Philly news, Philadelphia Energy Authority news, Solar news, Statkraft Plans Berry Burn Wind Farm Expansion (Int'l. Report) Norwegian state owned Statkraft AS reports it is seeking Scottish government approval to expand its 66.7-MW Berry Burn wind farm in Moray, Scotland to 104.5 MW with nine additional turbines totalling 37.8 MW. The additional turbines are expected to generate 139.1 GWh of electricity per year, or enough to supply over 35,500 homes. The 29-turbine Berry Burn wind farm originally came online in 2014. (Source: Statkraft, PR, Renewables, 18 Aug., 2020) Contact: Stakraft, More Low-Carbon Energy News Statkraft news, Wind news, Scotland Wind news, Azelio Announces Masdar Renewable Energy Storage Project (Intl. Report) Gothenburg, Sweden-headquartered global engineering firm Azelio AB reports along with Masdar and Khalifa University its will install a verification project in Abu Dhabi in Q3 2020 to evaluate Azelio’s renewable energy storage technology for inclusion in the Masdar product portfolio for current and future renewable energy projects. The evaluation project will be set up and installed by ALEC Energy, the solar business division of ALEC Engineering and Contracting LLC, part of the Investment Corporation of Dubai. Azelio and ALEC Energy have signed an MoU, covering a collaboration over 49MW installed capacity of Azelio’s energy storage until 2025. (Source: Azelio, Middle East Technical Review, 18 Aug., 2020) Contact: Azelio, Jonas Eklund, CEO, +46 709 40 35 80, jonas.eklind@azelio.com, www.azelio.com More Low-Carbon Energy News Azelio news, Energy Storage news, Renewable Energy news, Dominion Energy Snares 62.5MW Virginia Solar Project (M&A, Ind. Report) In the Old Dominion State, Richmond-based Dominion Energy is reporting acquisition of a 62.5-megawatt solar power project in Orange County from Cypress Creek Renewables . The facility is expected to go online in 2022. Falls Church-based Northrop Grumman Corp. will purchase the facility's renewable energy from the grid to power its operations. (Source: Dominion Energy, PR, 17 Aug., 2020) Contact: Dominion Energy, Robert Blue, Exec. VP, . Cypress Creek Renewables More Low-Carbon Energy News Dominion Energy news, Solar news, Cypress Creek Renewablse news,


Azelio Touts Masdar Renewable Energy Storage Project (Intl. Report)
Azelio
Date: 2020-08-19
Gothenburg, Sweden-headquartered global engineering firm Azelio AB reports along with Masdar and Khalifa University its will install a verification project in Abu Dhabi in Q3 2020 to evaluate Azelio's renewable energy storage technology for inclusion in the Masdar product portfolio for current and future renewable energy projects.

The evaluation project will be set up and installed by ALEC Energy, the solar business division of ALEC Engineering and Contracting LLC, part of the Investment Corporation of Dubai. Azelio and ALEC Energy have signed a collaborative MoU covering 49 MW installed capacity of Azelio's energy storage until 2025. (Source: Azelio, Middle East Technical Review, 18 Aug., 2020) Contact: Azelio, Jonas Eklund, CEO, +46 709 40 35 80, jonas.eklind@azelio.com, www.azelio.com

More Low-Carbon Energy News Azelio,  Energy Storage,  Renewable Energy,  


Noor Ouarzazate Solar Energy Storage Complex Opens (Int'l.)
Azelio ,Masen
Date: 2020-03-09
Gothenburg, Sweden-headquartered Azelio -- fka Cleanergy -- is reporting installation of its renewable energy storage with 24-hour clean power production at the Noor Ouarzazate solar complex in Morocco.

Azelio's system uses recycled aluminum as a storage medium, contains no rare minerals , suffers no reduced capacity over time and is scalable from 100 kW to 100 MW .

The installation is a partial result in a joint technical and business development agreement between Azelio and the Moroccan Agency For Solar Energy (MASEN. (Source: Azelio, PR, Tech Review Middle East, 8 Mar., 2020) Contact: Azelio, Jonas Eklind, CEO , +46-709-40-35-80, jonas.eklind@azelio.com, www.azelio.com; MASEN, www.masen.ma

More Low-Carbon Energy News Azelio,  Solar,  Energy Storage ,  


Biodico, Azelio Partner on Plant Energy Storage (Ind. Report)
Azelio, Biodico
Date: 2019-11-20
Gothenburg, Sweden-headquartered Azelio -- fka Cleanergy -- energy storage solutions provider Azelio reports it is partnering with Ventura, California-based sustainable biofuel producer Biodico to develop 120MW in thermal energy storage systems for Bioico's planned on-site renewable energy powered biofuel production centers in California by 2024.

Azelio's systems will feature solar PV, wind, as well as its power storage unit, which will ensure supply of base-load energy. The projects include a 13kWe energy storage that is slated for completion in 2021, followed by other projects including 15MWe in 2022, 35MWe in 2023 and 70MWe in 2024.

Privately held Biodico builds, owns and operates sustainable biofuel and renewable energy facilities; conducts R&D with the U.S. Navy; and collaborates with strategic joint venture partners to patent and commercialize proprietary technologies for the sustainable multi-feedstock modular production of next-generation biofuels. (Source: Azelio, Power Tech, 19 Nov., 2019) Contact: Biodico, Russell Teall, CEO, (805) 683-8103, info@biodico.com, www.biodico.com; Azelio, Jonas Eklind, CEO, +46-709-40-35-80, jonas.eklind@azelio.com, www.azelio.com

More Low-Carbon Energy News Azelio,  Biodico,  Energy Storage,  

Showing 1 to 10 of 10.